Describe each uniform segment
Use horizontal length, top and bottom excavation widths, and vertical depth, all in metres. Pipe diameter or cover above a pipe is not trench width or total depth. Split the route where dimensions change; calculate non-overlapping segments separately and add their volumes instead of multiplying unrelated average dimensions.