Wastewater/ CALCULATOR

Sump pit storage and pump cycling

Estimate active pit volume, fill time, drain time and starts per hour from measured levels and flows.

Measure the clear internal diameter.
Use the observed vertical travel between control levels.
Estimate during a representative wet condition.
Use measured discharge flow at the real head, not a free-flow maximum.
Active storage between levels

56.55 L

Net drawdown flow while pumping

68.00 L/min

Time from pump-off to pump-on

4.71 min

Pump run time per cycle

0.83 min

Estimated starts per hour

10.82 starts/h

Pump-flow margin above inflow

566.67 %

Interpretation:The pump lowers the level at 68 L/min and this scenario produces about 10.82 starts per hour. Confirm the permitted cycling with the pump manufacturer.

A cylindrical pit, steady inflow, unchanged pump performance and simple on/off control. Verify the manufacturer’s minimum run time and starts-per-hour limit. Debris, check-valve leakage, rising head and power loss are separate risks.

Continue your calculation